MODIKO® has 11 years of experience in the national and international market and is distinguished by offering exclusive and patented galvanized steel construction solutions. safe construction. The moment you enter a MODIKO® house you are immediately surprised.

Whats happening with modiko in Portugal?

Another MODIKO® project has been concluded in Vila do Conde by our partner from Medidas Práticas in the Porto region. It culminated in an Open House held on 16 September, where the doors were opened to anyone interested in getting to know this innovative system from the viewpoint of both technology and construction.

How long does it take to build a modiko house?

Another MODIKO® work successfully completed. The house was built in cooperation with partner Medidas Práticas and is located in Recezinhos – Penafiel. The house took 4 months to be built and has a gross floor area of 102,40 m2.

How long does it take to build a house?

Looking at the latest data from the US Census Bureau (2018), the average completion time for a single-family home is almost 8 months, including 30 days from authorization (permitting) to start and 6.7 months from start to completion of the construction.

Why do construction projects take so long to build?

The overall time of a build usually depends on labor, supply chain issues, and weather conditions. Construction can easily be delayed by labor shortages, construction supply and building material hold-ups, and shifts in temperature or too much precipitation. Other factors that can cause a delay?

What happens during the construction of a new home?

Once the frame – or skeleton of the home - is finished, your home builder and his crew can start work on siding and roofing as well as wiring and plumbing in the new home. Expect to see wires, pipes, sewer lines, and vents running through the floor, walls, and ceilings as water heaters and the HVAC system are installed.